Pre-launch testing

Est. Reading Time: 3 minutes

I’ve spent the last two weeks system testing a large ecommerce site that we are about to launch.  Testing is a vitally important phase of a project here at Beacon and something we don’t take at all lightly!  We usually build a minimum oftwo weeks into the time line for internal testing and two weeks for client testing, if the project plan can possibly accommodate it.

Don’t forget the following steps when doing your own site testing:

With these tips and, most importantly, devoting time and effort to testing, I hope that you will have a very successful site launch!

-Annette